Shenzhen China Construction Bank Tower
Financial-grade Intelligent Power Distribution System

As an important financial center of China Construction Bank in Shenzhen, Shenzhen CCB Tower has extremely high requirements for power system security and reliability. The dual redundancy power distribution system designed by AIWASON, combined with biometric interlock technology, provides the highest level of security for trading floors and vault branches.
The core feature of the system lies in its intelligent security management mechanism. Critical tap-off points are equipped with biometric interlock systems, allowing only authorized personnel to operate, ensuring operational security of the power system. Vault branches adopt 2-hour fire-resistant design and integrate temperature monitoring systems.
The dual redundancy architecture ensures business continuity for banking operations. Main and backup power supply circuits achieve complete isolation. Once the main circuit encounters problems, the backup circuit can achieve seamless switching at millisecond level, ensuring uninterrupted trading systems.
The intelligent monitoring system provides 24/7 real-time monitoring of the entire building's power operation status, including key parameters such as voltage, current, and power factor. The system also has predictive maintenance capabilities, able to identify potential problems in advance and provide timely warnings, ensuring stable operation of banking business.
Key Features
- Dual redundancy ensures business continuity
- Biometric interlock security control
- Authorized management of critical tap-offs
- 2-hour fire resistance for vault branches
- Integrated temperature monitoring system
- Millisecond-level seamless switching
- 24/7 real-time status monitoring
- Predictive maintenance warnings
Specifications
Awards & Recognition
