Back to Home|Project Details

Shenzhen Bao'an International Airport Upgrade

24/7 Intelligent Power Distribution for Aviation Hub

Fuyong Street, Bao'an District, Shenzhen
2024年3月
Transportation Hub
Shenzhen Bao'an International Airport Upgrade

Shenzhen Bao'an International Airport, as an important aviation hub in the Greater Bay Area, handles over 50 million passengers annually. The T3 terminal expansion project places extremely high reliability requirements on the power system. AIWASON provides a comprehensive fire-resistant intelligent optoelectronic busbar upgrade solution for this project.

The project covers critical areas including terminals, data centers, and baggage handling systems, adopting redundant power distribution architecture to ensure 24-hour uninterrupted operation. The system integrates advanced fault warning technology that can provide early warnings before faults occur, minimizing impact on flight operations.

Targeting the complex operating environment of airports, the system designs multi-level safety protection mechanisms. Important equipment adopts dual power supply, and critical loads are configured with UPS backup power. The intelligent monitoring system provides real-time monitoring of power quality to ensure stable operation of precision equipment.

The project also considers future expansion needs, reserving sufficient power capacity and interfaces. As the airport's level of intelligence continues to improve, the system can support the integration of new technology equipment, ensuring the airport's sustainable development.

Key Features

  • Terminal and airside redundancy architecture
  • 24/7 uninterrupted operation guarantee
  • Critical load condition monitoring
  • Multi-level safety protection mechanisms
  • Dual power supply ensures reliability
  • Real-time power quality monitoring
  • Fault warning and rapid isolation
  • Reserved future expansion interfaces

Specifications

Rated Capacity
8000A
System Voltage
35kV/10kV/380V
Coverage Area
T3 Terminal/Baggage System/Data Center
Annual Passenger Flow
50M+
Operation Mode
24/7 Continuous Operation
Redundancy Level
N+1

Awards & Recognition

Civil Aviation Infrastructure Excellence Award
2024
Outstanding performance in airport power system upgrade and renovation

Explore More Projects

Back to Home
Shenzhen Bao'an International Airport Upgrade | AIWASON | AIWASON